Cornea LightingB2B HubCalculatorsUtility Rebate Estimator
dlc led tube rebate calculatorutility rebate led lightingdlc qpl rebate estimator

Utility Rebate Estimator

Estimate DLC QPL utility rebates for your LED tube retrofit by state. Compare DLC Standard vs Premium rebate tiers.

Estimate Your Rebate

Program note: PG&E, SCE, SDG&E — DLC Premium required
$30
Rebate per Fixture
$3,000
Total Rebate
Premium ≥140 lm/W
DLC Tier

LED Tube Rebate by State (2024–2025)

StateDLC StandardDLC PremiumKey Utilities
CA$10/fixture$30/fixturePG&E, SCE, SDG&E
NY$8/fixture$25/fixtureCon Edison, NYSEG
TX$5/fixture$15/fixtureOncor, CenterPoint
FL$5/fixture$20/fixtureFPL, Duke Energy
IL$8/fixture$22/fixtureComEd, Ameren
WA$10/fixture$28/fixturePSE, PacifiCorp
MA$12/fixture$30/fixtureEversource, National Grid
CO$8/fixture$20/fixtureXcel Energy
OH$5/fixture$15/fixtureAEP, FirstEnergy
GA$5/fixture$18/fixtureGeorgia Power

* Rebate amounts are estimates based on 2024–2025 utility program data. Verify current rates at designlights.org and dsireusa.org.

Frequently Asked Questions

How do I apply for LED tube utility rebates?
Step 1: Verify your LED tubes are on the DLC QPL at designlights.org. Step 2: Check your utility's rebate portal (e.g., pge.com/rebates, coned.com/rebates). Step 3: Complete the rebate application with purchase invoices and product spec sheets. Step 4: Submit within the utility's deadline (typically 90–180 days after installation).
Do I need DLC Premium for maximum rebates?
Yes. Most utilities offer 50–100% higher rebates for DLC Premium (≥140 lm/W) vs DLC Standard (≥100 lm/W). All Cornea LED tubes are DLC QPL listed; specify DLC Premium grade when ordering for maximum rebate eligibility.
Can I combine utility rebates with Section 179D tax deductions?
Yes. Utility rebates and Section 179D tax deductions are separate programs and can be combined. Section 179D provides $0.50–$5.00/sq ft tax deduction for commercial buildings meeting ASHRAE 90.1 lighting standards. LED tube retrofits typically qualify for the full $5.00/sq ft deduction.

Ready to Source DLC-Listed LED Tubes?

Factory-direct from Zhongshan. DLC QPL, UL, CE certified. MOQ 100 pcs. Ships in 5 days.